symmetry park, Swindon / M4 J15 extends in total to 96 acres and benefits from planning consent for up to 1.3 million sq ft of B8 use. Construction commences in July on the 217,323 sq ft speculative unit with practical completion due in Q1 2018. The remainder of the site is available with outline consent as shown on the indicative masterplan below. The access, services and infrastructure works are now in place to the entrance of the park, ensuring the site is fully serviced for a faster delivery to market. The site provides a premier B8 use location with access to key markets and is strategically positioned between London and Bristol at the heart of the M4 corridor. The development provides a rare opportunity to occupy a single build to suit building of over 1 million sq ft in the South of the UK, smaller options are also available.
The site is strategically located to the east of Swindon, adjacent to the A420 carriageway, and along with the A419 dual carriageway, provides direct access to junction 15 of the M4 which is within 4 miles.
Warehouse
First floor offices
Unit 1 | ||
Net warehouse area | 204,560 sq ft | 19,004 sq m |
First floor offices | 12,440 sq ft | 1,156 sq m |
Gatehouse | 323 sq ft | 30 sq m |
Total area | 217,323 sq ft | 20,190 sq m |
Loading docks | 20 | |
Level access | 4 | |
HGV parking | 35 | |
Car parking | 209 | |
Net site area | 9.6 acres | 3.99 hectares |
Unit 2 | ||
Net warehouse area | 985,165 sq ft | 91,527 sq m |
Office (3 storey) | 48,434 sq ft | 4,500 sq m |
Total area | 1,033,599 sq ft | 96,027 sq m |
Loading docks | 120 | |
Level access | 8 | |
HGV parking | 263 | |
Car parking | 750 | |
Net site area | 63.95 acres | 25.88 hectares |